Week #21 2/5 - 2/9
- miloaustin8
- Feb 8, 2024
- 1 min read
this week in shop I still have to wait for my wood to come so I took on some shop projects that were not too serious. I started by continuing my table shelf project to an additional table. The struggle I faced was that the soldering table needs to fit peoples legs and also have storage underneath. To do so the design features a large swooped shape cut out of the front of the shelf to fit the chairs and peoples feet. Bellow is a picture of the space and the shelf design.
The next task that I took on was attaching an LED inside of our paint booth that was previously taped in. I still need to wait for the LED driver to come but besides that the paint booth is all set.
Lastly this week I worked on a project provided by my advisor Mr. Christy. He has a type writer that you can send messages to and it goes with a very large real of paper. in order to have the messages be legible the type writer needs a stand that can hold it up and have the paper be shown clearly.
تعليقات